Putting Learning Systems to Work:
Applying Learning Technology to Innovative Project Development
As technology investments receive heavy scrutiny, it becomes prudent to leverage investment technology such as e-learning into profit-driven applications. This technology has been recently applied to improving school systems [3]. Industry projects, too, can benefit by integrating: knowledge management for sharing and creating knowledge and artifacts; electronic learning systems to remove temporal and geographic limitations, and to create a structure conducive to learning;
and project management to meet the objectives of the intended project within time and budget constraints.
This case study discusses the results of one such learning project, undertaken at a leading semiconductor manufacturing organization in cooperation with a university research center. Of interest is how e-learning technology facilitated business process management. Also of interest is to note that active management of the technology is necessary; the introduction of the e-learning system was not initially embraced by the team. Readers in adaptive learning projects may find our taxonomy, recommendations, and lessons learned to be useful for their own situations.
Creating a Learning-Based Project Centered Tool
University research centers unify applied research and industry relevance for innovative results. Such centers aid industry to examine likely, yet unproven, processes and/or technologies. In such an environment, knowledge management is critical; the need to work within a defined schedule is paramount; and the ease of acquiring a plethora of specialized tools is paradoxically unlikely. Thus, these constraints motivated us to employ learning system technology within our project development efforts.
Purpose
Our project was chartered to create an initial ontology that would contribute to cross-functional communication [2] for failure analysis and failure identification (FA/FI) within the semiconductor industry. The academic team consisted of a professor, an associate professor, and two Ph.D. students. The industry team included a quality manager, various lab analysts, managers, and selected customers of the microscopy lab where FA/FI analysis was conducted. The academic team and the industry quality manager became the core team; other team members participated opportunistically as the project evolved. A management steering committee of industry and academic directors met periodically to review results and status.
The core team had valuable, yet disparate backgrounds, yet had not worked together previously. The academic team was geographically distant from the industry quality manager. Additionally, the project itself had to occur in an accelerated fashion with little time available for education and team-building. Therefore, adopting collaboration and learning technology to address the aggressive, yet increasingly all-too-common project expectations, was imperative.
Roles
The roles involved are typical of many knowledge-oriented projects. In addition to the core team, who have direct responsibility for the project's results, are non-core team members who participate only with regard to knowledge transfer. They are not required to improve their own expertise nor are they required to produce the anticipated results for the project. It should be noted that while each member of the core team acts primarily in one of the roles defined below, such a small team becomes highly productive when participants act outside of their primary roles whenever such participation is collaboratively productive.
Functional Director: The functional director acts as the governance structure moderating project activities to external strategy and requirements, attending planning meetings and participating actively in interviewing sessions, but remaining primarily in a guidance and strategic planning role.
Project Owner: The project owner drives the project from an operational task and schedule perspective and performs coordination for meetings and interviews. The project owner actively participates in interviewing and project planning sessions.
Site Owner: The site owner constructs and directly manages the KM/learning/project management technology. These duties include initial population of the learning system (hereafter called "the site"), administration and organization of material, and site strategy to encourage site participation. Additionally, the site owner is an active team participant and not merely a support person.
Team Participant: The role of team participant, performed to some extent by all core team members, is the development of the project's results, which include participation in interviews, research and uploading of helpful support materials, development of presentation material and documentation of results, model construction, and assessment activities.
Results Owner: The results owner implements the project's results. Traditionally, this role can be considered as a passive customer, but optimally, the results owner is actively involved (which occurred in our project). The results owner, as the recipient of the implementation, is highly motivated to encourage its success. In our project, the results owner coordinated meetings and operational communication between the academic team and the non-core team members. Initially her critical responsibilities included assisting in the identification of domain vocabulary and process, and promoting credibility of the core team to the other project participants in terms of the importance of the project to their organization and in the anticipated benefits to the team participantsfrom the success of the project. By actively participating, the results owner becomes a first-order core team member and minimizes organizational problems.
Blackboard Typography Design
We employed the Blackboard Learning System, and while structured for traditional education environments (i.e., courses) [1], we used creativity in expanding it to a project management role. Some Blackboard menu options are constrained, so we adapted a reasonable labeling system (see Figure 1). Our selection of menu options created a knowledge resource center with knowledge management, learning, and project management capabilities. Each of the selections is described in this section. Announcements generally guide the usage of the site (and by default, the project); additional sections store reference material (Books, Web sites, Staff Information). The final sections cover direct materials and interaction relating to project objectives (Information, Projects, Communication, and Discussion Board). The Tools option (at this level) is standard, relating to the mechanical use of the Blackboard system.

Announcements
This section provides system coordination, announcing new additions to the resource center, as well as for general knowledge or guidelines. The Blackboard system does not automatically announce new material (with the exception of the Discussion section which does alert one to new messages). Additionally, no method indicates new, versus previously read, submissions, which is a bit tedious when using a system where a sequential or logically prescribed flow cannot be predetermined. Therefore, we used two mechanisms: email for priority notification and announcements for all newly entered messages and materials. With this plan, email briefly notes that new material exists on the site. (Email of new material encourages prompt participation; as interaction and new material increase on the site, over time the use of email is reduced only to interactions needing priority attention.) Announcements, then, provide detail on where the material can be found.
The Announcements section is also useful for reminders, after an initial message is posted in the appropriate Discussion topic (see below). Announcements are not encouraged for meeting announcements as daily, or regular, use of the system is not required.
Books
The Books section provides peripheral information, i.e., information useful but not critical to the project. ("Books" and "Information" were chosen because of the limited number of options allowed in the first level menu system. As all other levels supported user-defined labels, it is only a minor inconvenience.) This separation (from directly related material, which we included in the Information section) reduces the volume of reference material anticipated. As such, this section includes books, articles, and related information. Whether the material is of peripheral or direct value is determined when submitting files.
Web Sites
Some material optimally lists web link references in the Web Sites section. This is useful to point to a body of knowledge and preserve intellectual property rights that might exist with certain materials.
Staff Information
The Staff Information includes normal contact information relating to the core team project members, such as name, title, email address, phone, and photo (optional).
Tools
The Tools section is a standard option allowing the vendor and our own university IT organization to provide links relating to procedural and mechanical use of the Blackboard system.
The next four sections of the site constitute those most directly associated with the project deliverable and its progress.
Information
The Information section is for materials known to directly support the project but not created by the project. These materials often (as they did for us) relate to assumptions and justifications for project deliverables.
Projects
The Projects section includes all direct documents and materials developed. Project activities and materials are further sub-divided into Logistics, Deliverables, Sample Data, Context Information, and Tools. Logistics relate to meeting schedules, agendas, bridge numbers used for conferences, and meeting minutes. Deliverables relate to artifacts developed (e.g., in our case, for the FA/FI ontology model), including vocabulary, data flow diagrams, use cases, and reports. Sample Data relate to detailed reports, diagrams, and database models. Context Information includes diagrams and interview notes; this section is a work-in-progress section in contrast to the Deliverables section which targets final deliverables. The Tools section here is specific to technology anticipated to be used during the project.
Communication
The Communication section provides interactive communication allowing members to send email without leaving the site. It also includes a discussion board, which is also available as a first-level option.
Discussion Board
The Discussion Board supports interaction and is preferred over email for significant project dialogue. While email is ad hoc and unthreaded, the discussion board topics allow for linked interaction flow. This capability is most useful when adding participants once the site has become active for some time. It also provides a better memory tool than email in determining how previous decisions and conclusions occur.